Loading water
These 5 gallon jugs are being pulled up with a line along the ladder to deck level where Herm pours them into the tank through the deck opening. Note that the halyards, dodger, mainsail, rollerfurling jib, spinnaker (in green bag) and extra fuel cans (also the bimini and all of the fenders, the captain's seat, mooring lines, boogie board and other misc.) are now near their proper places. They had been stored inside to protect them from the sun and dirt all summer. We can now actually get around inside the boat to store the new provisions, varnish the cabin sole etc. Our launch time is Saturday at 10 AM, UNLESS Hector has another "problema" with the stuffing box!




