Sunday, September 26, 2010

new playground

 In about a month, this playground will be finished and open to the kids. The concrete slab is for the picnic shelter, soon to be built. The field has a paved track, 1/4 mile around. This photo was taken from the trail up the butte.
Posted by Picasa

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home